This project consists of four (4) separate buildings, a CT Trailer and connecting corridors for a total of 8,288 gsf to be utilized as a temporary replacement hospital. The entire building is 100% covered with an automatic sprinkler system per NFPA 13. This project is currently being built under an extremely tight schedule due to its emergency nature. Update: TCO was achieved within 8 weeks from mobilization.

Project Size

$4.6 Million

Completion

2018

Owner

Baptist Health of South Florida