OVERVIEW

For TAHO Investments our firm performed the repairs to the stone joints with structural grout mortar followed by exterior rated waterproof grouting of same. The FLC team also fixed the cracks by routing and sealing with urethane recessed and cement textured and blended grey to white to match as closely as possible to existing finish.

 

We also:

Conducted spall repairs on jambs as needed.

Repaired waterproofing behind bell tower.

Pressure washed and installed 100% solids sealer.

Conducted water test to determine effectiveness of repairs.

Project Size

$35 Thousand

Completion

2021

Owner

TAHO Investments